Project Targets
Alasala
The Alasala target is a 2.4 km long x 250 m wide soil anomaly with extensive artisanal gold mining activity. Previous drilling on the target returned 19.6 m @ 6.17 g/t Au andand 7.69 g/t Au over 6.0m. The follow up 2024 drill program, expected to begin early Q3 2024, will focus on drilling for high grade mineralization at Mandingo Hill, along a 2km trend.
Arthington
The Arthington target is a 4+ km long soil anomaly with existing artisanal workings. Phase I and II drilling on the target consisted of 5,557m targeting 800 m along strike at Arthington. Drilling intersected multiple highly sheared and sulphide-bearing mineralized zones and led to the discovery of a 1.5km gold mineralized trend with highlights of:
- 6m @ 7.5g/t Au
- 6m @ 6.6 g/t Au
- 10 g/t Au over 25.90m (from 93.30m) including 4.20 g/t Au over 9.10m
Follow up phase III drilling will focus on expanding mineralization and proving out the maiden resource.